Estimating Jobs
How to Quote a Job: A Complete Estimating Guide
Short answer
Quote a job in six steps: lock the scope in writing, list every line item separately, add 10–15% contingency for surprises, attach payment terms and a validity window, present the quote in person or by phone, and follow up within 48 hours if it goes unanswered.
Most lost jobs are lost in the quote, not in the work. A vague quote invites the customer to commodity-shop you against a competitor; a precise quote with clear scope and payment terms positions you as the professional. Here is the system field-tested by tens of thousands of trades — independent of industry.
The six-step quote process
- Walk the job. Don't quote sight-unseen unless it is a $100 service call you have done 50 times. The site visit is where you spot the gotchas that wreck your margin.
- Write the scope. List exactly what is included AND exactly what is excluded. Excluded items prevent change-order arguments.
- Price each line item. Materials, labor, subs, permits, equipment rental, disposal — every cost gets its own line, with a unit price.
- Add contingency. 10% for routine work, 15% for renovation, 20%+ for anything behind a wall or underground. This is not padding — it is the buffer that keeps you whole when reality intrudes.
- Attach terms. Payment schedule (deposit, progress, final), validity window (typically 30 days), late-fee policy, and your warranty.
- Present and follow up. Hand-deliver or schedule a call to walk through the quote. Follow up by text or email at 48 hours, then again at one week.
What a winning quote looks like
A winning quote does three things at once: itemizes enough to justify the price, totals to a single confident number at the bottom, and signals professionalism through clean formatting and clear terms. Customers who get three quotes are looking for reasons to disqualify. Don't hand them ammunition.
Include: scope, exclusions, line-item pricing, totals, deposit amount, validity date, your license number, insurance certificate reference, warranty, and a signature block. Send as a PDF — never as a text in the body of an email.
Contingency math
On a $5,000 bathroom remodel, 15% contingency adds $750 to the price. If everything goes smoothly, that $750 is profit. If the subfloor is rotted under the tub (it usually is), the $750 covers the surprise without you having to call the customer for a change order.
Customers do not see your contingency line — it is rolled into your labor or 'site preparation' line item. Internally, you track it as a margin buffer.
The follow-up sequence that wins more jobs
75% of jobs are won by the contractor who follows up first. Send a text within 48 hours: 'Hi Sarah — checking if you had any questions about the quote I sent. Happy to walk through it on a call.' If no answer in a week, follow up again with a soft scarcity nudge: 'I have an opening the week of the 22nd — wanted to give you first option before I book it out.'
Stop chasing after three touches. A customer who has not responded in three weeks is not coming back.
Frequently asked questions
How long should a quote be valid?
30 days is standard. Material prices and your schedule move; an open-ended quote exposes you to both. State the expiry date on the document.
Should I show line-item labor hours?
No. Show labor as a dollar amount or as 'installation' — never as hours. Hours invite negotiation and let the customer second-guess your speed.
What's the win-rate I should aim for?
Roughly 40–60% on quoted jobs. Below 30% you are overpriced or unfocused; above 70% you are underpriced and leaving margin on the table.
Turn pricing into invoices.
Glo Invoice creates branded estimates and invoices from your pricing in seconds — free for 14 days.
Sources & further reading
Primary sources we consulted when writing and reviewing this guide.